docs: update exam dates to July 7 primary / July 17 hard deadline; add retake window and completed work log
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
1bd8ce13ec
commit
202140e2ac
3 changed files with 132 additions and 144 deletions
18
MEMORY.md
18
MEMORY.md
|
|
@ -1,10 +1,11 @@
|
|||
# CompTIA A+ Core 2 Study Memory
|
||||
|
||||
Last updated: 2026-06-11 20:14 CDT
|
||||
Last updated: 2026-06-19 CDT
|
||||
|
||||
## Goal
|
||||
|
||||
Prepare to pass CompTIA A+ Core 2 by June 30, 2026.
|
||||
Pass CompTIA A+ Core 2 on **July 7, 2026** (primary exam date).
|
||||
Hard deadline: **July 17, 2026** — if July 7 is not a pass, retake and pass by July 17.
|
||||
|
||||
Target exam:
|
||||
- Certification: CompTIA A+ Core 2 V15
|
||||
|
|
@ -45,8 +46,11 @@ Priority rule:
|
|||
## Progress State
|
||||
|
||||
Current status:
|
||||
- Study system created.
|
||||
- Study system created. All lessons, labs, and quizzes built for all 4 domains.
|
||||
- Objective 1.1 / OS-5 studied on 2026-06-11; quiz score 7/7. Status: Strong. Lab still pending.
|
||||
- June 17: SEC-6 (10-Step Malware Removal) studied and updated. OS-4 updated with DISM/bootrec/taskkill. FLASH_NOTES.md created. Sybex baseline ~50% — weak area: "Next Step" troubleshooting logic.
|
||||
- June 18: OS-1 and OS-2 quizzes completed.
|
||||
- June 19 (today): OS-3 Admin Tools lab — current task.
|
||||
- Baseline quiz replaced by section quizzes after study.
|
||||
- OS-1 lesson/lab/quiz created: Windows editions and system information.
|
||||
- OS-2 lesson/lab/quiz created: Windows installation, boot, and recovery.
|
||||
|
|
@ -67,11 +71,9 @@ Current status:
|
|||
- User can sometimes access a friend's Mac. Do not block progress on Mac access, but include real Mac labs for objective 1.8.
|
||||
|
||||
Next action:
|
||||
- User should run the OS-5 lab when convenient, then continue to objective 1.2: OS installation and upgrade.
|
||||
- If skipping the OS-5 lab for now, begin OS-2 study and quiz for objective 1.2.
|
||||
- OS-3 is ready after OS-2: Windows administrative tools.
|
||||
- OS-1 quiz now has 7 questions.
|
||||
- OS-4 is ready after OS-3: Windows command line.
|
||||
- June 19 (today): OS-3 Admin Tools lab + 3 "Next Step" scenario drills.
|
||||
- Continue the sprint in SCHEDULE.md through July 7.
|
||||
- If July 7 exam is not a pass, execute the retake plan (July 8–17) in SCHEDULE.md.
|
||||
- OS-5 is ready and covers objective 1.1. It can be studied before OS-1 if starting from fundamentals.
|
||||
- OS-6 is ready after OS-4: Windows Control Panel and Settings.
|
||||
- OS-7 is ready after OS-6: Windows networking.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue