comptia-a-plus-core2/SCHEDULE.md
2026-06-19 02:23:33 -05:00

4.1 KiB
Raw Permalink Blame History

CompTIA A+ Core 2 Final Sprint Schedule

Current Date: June 19, 2026
Primary Exam: July 7, 2026 — 18 days
Hard Deadline: July 17, 2026 — retake window if July 7 is not a pass


What's Been Completed

Date Task Status
Before June 11 All lessons, labs, quizzes created — OS (111), SEC (111), TRB (14), OPS (110) Done
June 11 OS-5 quiz: 7/7. Lab pending. Done
June 17 SEC-6 (10-Step Malware Removal) studied. Updated OS-4 with DISM/bootrec/taskkill. FLASH_NOTES.md created. Sybex baseline: ~50% — "Next Step" logic identified as weak area. Done
June 18 OS-1 and OS-2 quizzes Done

Sprint to July 7

Week 1 — Core Domains (June 1923)

  • June 19 (Today):

    • Study: Windows Admin Tools (Disk Mgmt, Event Viewer, Performance Monitor)
    • Lab: OS-3 Admin Tools Practice
    • Drill: 3 "Next Step" scenarios
  • June 20:

    • Study: Command Line (sfc, dism, chkdsk, gpupdate, bootrec, taskkill)
    • Lab: OS-4 Command Line Practice
    • Drill: SFC vs DISM trap — know when to switch
  • June 21:

    • Study: macOS & Linux client tools
    • Quiz: OS-8 and OS-9
    • Note: macOS lab optional (use friend's Mac if available)
  • June 22:

    • Study: Windows Networking (IP config, DNS, firewall, shares)
    • Quiz: OS-7
    • Drill: "Works by IP but not by name" scenario
  • June 23:

    • Study: Workstation Hardening + Data Destruction
    • Quiz: SEC-7 and SEC-9
    • Drill: Order of operations for secure disposal

Week 2 — Troubleshooting + Procedures (June 2430)

  • June 24:

    • Study: Troubleshooting Windows OS (boot errors, BSOD, profile issues)
    • Quiz: TRB-1
    • Drill: "Clicking hard drive = chkdsk /r" vs "BCD error = bootrec /rebuildbcd"
  • June 25:

    • Study: Troubleshooting Mobile OS & Apps
    • Quiz: TRB-2
  • June 26:

    • Study: Operational Procedures — Documentation, Ticketing, SLAs
    • Quiz: OPS-1
    • Note: Domain 4 is 21% — do not skip
  • June 27:

    • Study: Change Management + Backup/Recovery
    • Quiz: OPS-2 and OPS-3
  • June 28:

    • Study: Scripting Basics (Batch, PowerShell, Bash syntax)
    • Quiz: OPS-8
  • June 29:

    • Study: Professionalism, Safety (ESD), AI Concepts
    • Quiz: OPS-7 and OPS-10
  • June 30:

    • Mid-Sprint Full Practice Exam (Professor Messer)
    • Analyze every wrong answer — log weak domains

Final Push (July 17)

  • July 1: Targeted review of weak areas from June 30 exam
  • July 2: Full Practice Exam (Sybex) — hardest questions, aim for explanation accuracy
  • July 3: PBQ Marathon — Disk Management, Help Desk, Command Line simulations
  • July 4: Acronyms, port numbers, and "Next Step" logic review
  • July 5: Final Full Practice Exam — simulate real conditions (90 min, no notes)
  • July 6: Light review only — 10-Step Malware Removal and Troubleshooting Methodology
  • July 7: EXAM DAY. Trust the process.

Retake Window: July 817 (Only if July 7 is Not a Pass)

  • July 8: Review score report — identify exact weak objectives
  • July 910: Intensive drill on the 23 weakest objectives only
  • July 11: Full practice exam focused on weak domains
  • July 1213: PBQ simulations + "Next Step" scenario drilling
  • July 14: Full timed practice exam — aim for 750+
  • July 15: Light review — acronyms, port numbers, order-of-operations
  • July 16: Rest. Review the one thing you feel least confident about.
  • July 17: RETAKE EXAM — HARD DEADLINE. Must pass today.

Domain Tracking

  • Domain 1.0 Operating Systems — 28%
  • Domain 2.0 Security — 28%
  • Domain 3.0 Software Troubleshooting — 23%
  • Domain 4.0 Operational Procedures — 21%

Known Weak Areas (from June 17 Sybex baseline)

  • "Next Step" troubleshooting logic — official CompTIA order matters
  • SFC vs DISM (when SFC fails → cache corrupt → run DISM RestoreHealth)
  • Malware response order: quarantine BEFORE scanning
  • Disk failures: clicking/missing = chkdsk /r vs BCD error = bootrec /rebuildbcd
  • DNS: works by IP not name = nslookup
  • Domain 4 Operational Procedures — highest risk for neglect