1,016 B
1,016 B
OPS-2 Quiz: Change Management
Take this after studying notes/OPS-2-change-management.md.
Reply with answers like:
1B 2A 3D 4C 5B
Questions
- What should a change plan include in case the update fails?
A. Wallpaper plan
B. Rollback plan
C. Keyboard shortcut list
D. Browser favorites
- What type of change is usually low-risk, repeatable, and preapproved?
A. Emergency
B. Unknown
C. Standard
D. Unauthorized
- Why use a maintenance window?
A. To reduce impact on users and operations
B. To avoid documenting the change
C. To remove approval requirements
D. To skip backups
- What is a change freeze?
A. A file compression method
B. A hardware cooling feature
C. A command-line shell
D. A period when noncritical changes are restricted
- What should happen after an emergency change?
A. Delete all records
B. Document and review it according to policy
C. Ignore user impact
D. Disable ticketing
Answer Key For Instructor
- B
- C
- A
- D
- B